Quote:
Originally Posted by Ccgrady125
I have a onan 5.5 generator that I added to my voltage 3905. My remote panel with all the light switches and such has a hour meter and start switch built into it. Does anyone know how to wire this or have a wire diagram for the remote switch harness for gen. I was told it is just a ground momentary but I don't want to burn anything up.
|
My notes and drawing are in my barn. I can get to them this weekend. I made before and after schematics when I replaced my 5500 gasser for the 7500 diesel. Shoot me a PM Saturday morning as occasionally need a reminder...LOL
__________________
__________________
2019 Ram 3500 Limited w/ Max Tow pkg
2005 Cardinal 33LX
2014-3950, Full Paint, 17.5" tires, 370W solar, 3100W Magnum inverter w/ AGS, 7500w diesel generator, Micro-Air Easy Start 364 (x3) SOLD!
|